Technologies

Pre-Cast Transom

Reliable Engineering Services used the Pre-Cast Transoms technology for the first time in Pakistan in our landmark Metro Bus Projects.

1 PreCast

 

Table Span Transom

Reliable Engineering Services used the Table Span Transoms technology for the first time in Pakistan in our landmark Metro Bus Projects.

2 TableSpan

 

Elevated Box Girder Rotary

Reliable Engineering Services used the Elevated Box Girder Rotary technology for the first time in Pakistan in our landmark Metro Bus Projects.

3 BoxGirder

 

Keystone Geo-Grid Wall System

A Pre-Cast concrete retaining wall made by unit blocks (Keystone) machine made from Portland cement, water, and aggregates supported with Geogrid, a structural element formed of high-density polyethylene (HDPE) into a regular network of integrally connected tensile elements with apertures of sufficient size to allow interlocking with surrounding soil, rock, or earth and function primarily as reinforcement followed by Unit Drainage Fill. The geogrid shall be laid horizontally on compacted backfill and attached to the Keystone wall units.

Reliable Engineering Services used the Keystone Geo-Grid Wall System technology in various projects.

4 GeoGrid

 

Poly Urea Coating

It is a high reactive performance coating consisting of 1.5 to 2 mm wall thickness, and is composed of two liquid components Isocyanate Pre- Polymer and Amine terminated resin blend and is designed to protect various surfaces like concrete, steel, GRP and more. It is applied in the form of hot spray and high pressure with specialized equipment.

Reliable Engineering Services (Pvt) Ltd has introduced this technology in collaboration with our partner in RCC Conduit Sewer Project, Lahore and gave an economical solution for durability of concrete structure.

5 PolyUrea

 

HDPE T-Grip Liner

HDPE T-Grip Liner is commonly used in the construction industry to protect concrete surfaces against deterioration and corrosion in sewerage systems.

Reliable Engineering Services has introduced this technology in collaboration with our partner in Pre-Cast RCC Conduit Sewer project in Lahore.

6 TGrip