Projects

June 2016 – Flyover at Kahna Kacha Railway Crossing

Construction of Flyover at Kahna Kacha Railway Crossing, on BOT/PPP Basis

Client: Lahore Development Authority1 Flyover at Kahna Kacha Railway Crossing

Scope of Work:

  • Length of Flyover 1.5 KM
  • At Grade Service Lane Rd 3.0 KM
  • Road Drainage 3 KM
  • Toll Plazas 3 Nos

Key Items of Work

  • Concrete 13,000 CM
  • Steel Reinforcement 1900 TON
  • Asphalt base/wearing 22,500 TON
  • Sub-Base / WBM 28,300 CM

2 Lahore Metro Bus - Package III

Jan 2013 – Lahore Metro Bus (Package-III)

Construction of Metro Bus System along Ferozepur Road, Lahore. From Qartaba Chowk to MAO College (Package-III), Elevated Section, Length=2.5Km

Client:   TEPA, Lahore Development Authority

Scope of Work:

  • Elevated Portion 2.5 KM2 Lahore Metro Bus - Package III b
  • Pre-Cast Transoms 26 Nos
  • Table-Span Transoms 3 Nos
  • Elevated Rotaries 2 Nos
  • Pre-Eng Bus Stations 3 Nos
  • At Grade 3-Lane Roads 7 KM

Key Items of Work

  • Concrete 85,000 CM
  • Steel Reinforcement 25,000 TON
  • Asphalt base/wearing 28,500 TON
  • Sub-Base / WBM 21,000 CM

 

 


 

Jan 2013 – Metro Bus Project (Package-II b/2)

Construction of Metro Bus System along Ferozepur Road, Lahore

From Ichra to Qartaba Chowk (Package-IIb/2), Elevated Section, Length = 1.5 Km

3 Metro Bus Project (Package-II b-2)Client:   TEPA, Lahore Development Authority

Scope of Work:

  • Elevated Portion 1.5 KM
  • Pre-Cast Transoms 25 Nos
  • Pre-Eng Bus Stations 1 Nos
  • At Grade 3-Lane Roads 5 KM

Key Items of Work

  • Concrete 32,500 CM
  • Steel Reinforcement 4,500 TON
  • Asphalt base/wearing 31,000 TON
  • Sub-Base / WBM  29,000 CM

 

May 2015 – Rawalpindi – Islamabad Metro Bus Project (Package III)

Rawalpindi – Islamabad Metro Bus Project (Package III) 6th Avenue Road to I.J.P Rd

4 Rawalpindi – Islamabad Metro Bus Project (Package III)Client:   Rawalpindi Development Authority

Scope of Work:

  • Elevated Portion 2.5 KM
  • Pre-Eng Bus Stations 3 Nos
  • At Grade 3-Lane Roads 5.0 KM
  • At Grade 2-Lane Srvce Road 5.0 KM

Key Items of Work

  • Concrete 100,000 CM
  • Steel Reinforcement 14,000 TON
  • Asphalt base/wearing 20,620 TON
  • Sub-Base / WBM 15,000 CM

 

May 2015 – Rawalpindi – Islamabad Metro Bus Project (Package V)

Rawalpindi-Islamabad Metro Bus Project, Package V 5 Rawalpindi – Islamabad Metro Bus Project (Package V)

Shaheed e Millat Road  to Pak Secretariat

Client: Rawalpindi Development Authority

Scope of Work:

  • Elevated Portion 2.5 KM
  • At Grade 3-Lane Roads 5.0 KM

Key Items of Work

  • Concrete 95,000 CM
  • Steel Reinforcement 12,000 TON
  • Asphalt base/wearing 18,000 TON
  • Sub-Base / WBM 14,000 CM

 

Ongoing 2017 – Lahore Orange Line Metro Train Depot

Lahore Orange Line Metro Train Project, Depot at Dera Gujjran (Package-III)6 Orange Line Metro Train Depot

Client: Lahore Development Authority

Scope of Work:

  • Project Area 206,500 M2
  • Frame Structure Bldngs Area 27,000 M2
  • Pre-Engineered Buildings 41,980 M2
  • Reinforced Earth Wall 4,231 M2
  • Internal Roads Length 3.93 KM

Key Items of Work

  • Concrete 53,000 CM
  • Steel Reinforcement 8,110 TON
  • Asphaltic base/wearing 19,400 TON
  • Sub-Base / WBM 24,840 CM

 

Ongoing 2017 – Lahore Orange Line Metro Train (Package II)

Lahore Orange Line Metro Train Project, Chauburji To Ali Town (Package-II)7 Orange Train Chauburji To Ali Town (Package-II)

Client: Lahore Development Authority

Scope of Work:

  • Project Length 13.4 Kms
  • No. of Stations 13 Nos.
  • Surface Courses & Pavement 13.4 Kms
  • Storm/Rain water Drain 10.5 kms

Key Items of Work

  • Concrete 73,684 CM
  • Steel Reinforcement 17,303 TON
  • Asphaltic base/wearing 112,406 TON
  • Sub-Base / WBM 98,900 CM

 

Dec 2016 – Pakistan Kidney & Liver Institute and Research Center Lahore (Package A1)8 Pakistan Kidney & Liver Institute and Research Center Lahore (Package A1)

 


 

Dec 2016 – Pakistan Kidney & Liver Institute and Research Center Lahore (Package A3)

8 Pakistan Kidney & Liver Institute and Research Center Lahore (Package A3)


 

Jan 2017 – Pakistan Kidney & Liver Institute and Research Center Lahore (Package B)

8 Pakistan Kidney & Liver Institute and Research Center Lahore (Package B)

 


 

Ongoing 2017 – Canal Expressway (M-3) Interchange, Faisalabad

Construction of Canal Expressway from Gattwala Bridge to Sahianwala (M-3) Interchange, Faisalabad.9 Canal Expressway (M-3) Interchange Faisalabad

Client: City District Govt. Faisalabad

Scope of Work:

  • At Grade 3 Lane Rd 51.5 KM
  • Underpasses 3 Nos
  • Flyovers 2 Nos
  • Elevated U-Turns 4 Nos

Key Items of Work

  • Concrete 68,000 CM
  • Steel Reinforcement 8,000 TON
  • Asphalt base/wearing 230,000 TON
  • Sub-Base WBM 381,000 CM

 

June 2015 – Link Connecting Motorway, Lahore

Construction of Link connecting Motorway at Shahpur Kanjran to Raiwind Road & Khayaban e Jinnah on EPC/Turnkey basis.10 Link Connecting Motorway Lahore

Client: TEPA, LDA

Scope of Work:

  • Link Connecting Motorway 4.5 KM
  • Geo-Grid Wall 1 KM
  • Flyover 1 Nos
  • Under Pass 2 Nos

Key Items of Work

  • Concrete 8,575 CM
  • Steel Reinforcement 1,132 TON
  • Asphalt base/wearing 14,440 TON
  • Sub-Base / WBM 49,500 CM

 

June 2013 – Signal Free Junction at Qartaba Chowk, Lahore11 Signal Free Junction at Qartaba Chowk

Construction of Signal Free Junction at Qartaba Chowk, Ferozepur Road, Lahore.

Client: TEPA, LDA

Scope of Work:

  • At Grade 14 Lane MCW Rd 0.9 KM
  • At Grade 6-Lane Adjoining Rd 0.3 KM

Key Items of Work

  • Asphalt base/wearing 25,000 TON
  • Sub-Base / WBM 21,000 CM

 


Oct 2014Signal Free Junction U-Turns at Kamahan (Group I), Lahore12 U-Turns at Kamahan (Group I)

Construction of Signal Free Junction at Qainchi, Ghazi Road and Khaira. U-Turns at Kamahan (Group I)

Client: TEPA, Lahore Development Authority

Scope of Work:

  • Elevated Section 1.24 KM
  • At Grade 3 Lane Rd 3.0 KM

Key Items of Work

  • Concrete 23,000 CM15 Bike Rotary at Chungi Amarsadhu
  • Steel Reinforcement 3,523 TON
  • Asphalt base/wearing 10,730 TON
  • Sub-Base WBM 9,600 CM

 

Bike Rotary at Chungi Amarsadhu

 

 

 

 


Oct 2014 – Signal Free Junction U-Turns at Ghazi Road (Group II), Lahore

Construction of Signal Free Junction at Qainchi, Ghazi Road and Khaira. U-Turns at Ghazi Road (Group II)

Client: TEPA, LDA13 U-Turns at Ghazi Road (Group II)

Scope of Work:

  • Elevated Section 1.346 KM
  • Elevated Bike Rotary 1.089 KM
  • At Grade 3 Lane Rd 5.504 KM

Key Items of Work

  • Concrete 31,560 CM
  • Steel Reinforcement 5,880 TON
  • Asphalt base/wearing 18,360 TON
  • Sub-Base WBM 12,400 CM

 

Aug 2014 – Signal Free Junction Interchange at Qainchi Junction (Group III), Lahore

Construction of Signal Free Junction at Qainchi, Ghazi Road and Khaira. Interchange at Qainchi Junction (Group III)

Client: TEPA, LDA14 Interchange at Qainchi Junction (Group III)

Scope of Work:

  • Elevated Section 1.698 KM
  • At Grade 3 Lane Rd 5.379 KM

Key Items of Work

  • Concrete 26,000 CM
  • Steel Reinforcement 4,650 TON
  • Asphalt base/wearing 20,620 TON
  • Sub-Base WBM  10,285 CM

 

FEB 2016 – Sewerage System for UC 117, 118 & 120, Lahore

Provision of Sewerage System for UC 117, 118 & 120, Lahore (Construction of RCC Conduit, Package III)16 Sewerage System for UC 117, 118 & 120

Client: WASA

Scope of Work:

  • RCC Conduit 6’ x 6’ 7,440 Rft
  • RCC Conduit 7’ x 6’ 2,230 Rft
  • RCC Conduit 8’ x 6’ 3,264 Rft
  • Poly Urea Coating 333,000 Sft

Key Items of Work

  • Concrete 15,117 CM
  • Steel Reinforcement 1,300 TON
  • Asphalt base/wearing 63,400 TON
  • Sub-Base / WBM 70,700 CM

 

FEB 2016 – Restoration/Rehabilitation of Raiwind Road17 Restoration-Rehabilitation of Raiwind Road, Lahore

Provision of Sewerage System for UC 117, 118 & 120, Lahore (Restoration/Rehabilitation of Road)

Client: WASA

Scope of Work:

  • Widening and Improvement of Road and Road Structures

Key Items of Work

  • Concrete 2,750 CM
  • Steel Reinforcement 1,000 TON
  • Asphalt base/wearing 83,750 TON
  • Sub-Base / WBM 90,200 CM

 

Ongoing 2017 – RCC Precast Conduit & Disposal Station, Lahore

Construction of RCC Conduit Sewer from Shoukat Khanam Hospital 18 RCC Precast Conduit & Disposal StationChowk to Satukatla Drain, Lahore (RCC Precast Conduit & Disposal Station)

Client: WASA

Scope of Work:

  • Pre-Cast RCC Conduit 12’ x 8’ 1,680 Nos
  • Pre-Cast RCC Conduit 8’ x 8’ 800 Nos
  • Pre-Cast RCC Conduit 6’ x 6’ 560 Nos
  • HDPE T-Grip Liner 383,219 Sft

Key Items of Work

  • Concrete 11,550 CM
  • Steel Reinforcement 2,700 TON

June 2013 – Dualization of Road, Lahore

Dualization of Road From LOS Ferozepur Road to Multan Road, Lahore.19 Dualization of Road

Client: TEPA, LDA

Scope of Work:

  • Bridge over Drain(28M Wide) 2.168 KM
  • At Grade 3 Lane Rd 4.3 KM
  • Trunk Sewer 2.168 KM
  • Rider Sewer 4.2 KM

Key Items of Work

  • Concrete 63,000 CM
  • Steel Reinforcement 9,500 TON
  • Asphalt base/wearing 15,500 TON
  • Sub-Base / WBM 12,500 CM

 

Dec 2015 – Underpass at  Canal Expressway (20 Under PassesM-3) Interchange, Faisalabad

Construction of Canal Expressway from Gattwala Bridge to

Sahianwala (M-3) Interchange, Faisalabad

Client: City District Govt. Faisalabad

Mar 2015 Underpass at Karol Ghaati (Package-3C), Lahore Ring Road Project

Construction of Underpass at Karol Ghaati (Package-3C)

Client: Lahore Ring Road Authority

Project Cost: Rs 351 Million


 

Ongoing 2017 – Enhancing the Capacity of Charrar Drain, Lahore

Enhancing the Capacity of Charrar Drain to Cater for Rain Water of Ring Road, Lahore21 Enhancing the Capacity of Charrar Drain

Lahore

Client: Irrigation & Power Dept

Scope of Work:

  • Excavation and Dressing of Drain banks
  • Lining of Old Drain to cater for Rain Water
  • Enhancement in capacity of Drain

Key Items of Work

  • Concrete 5,500 CM
  • Brick Work 800 CM
  • Earth Work Excavation 61,867 CM
  • Sub-Base / WBM 2,310 CM